youTube Twitter
Projects
Pages | 1  |  2  |  3  |  4  |  5  |  6  |  1 - 20 of 112
Great Britain

London - Great Britain

1 Alie Street

1 Alie Street

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1332 kW
Installed machines:
2x FOCS/LN 2722

Great Britain

London - Great Britain

1 Old Jewry

1 Old Jewry

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 868 kW
Installed machines:
2x FOCS/SL 1922

Great Britain

London - Great Britain

1 Tudor Street

1 Tudor Street

Period: 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 608 kW
Installed machines:
2x NECS/SL 1204

Great Britain

London - Great Britain

10 Fenchurch Street

10 Fenchurch Street

Period: 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 793,2 kW
Installed machines:
2x FOCS/SL 1962

Great Britain

London - Great Britain

10 Gresham Street

10 Gresham Street

Period: 2005
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1588 kW
Installed machines:
2x FOCS 3602

Great Britain

London - Great Britain

107 Cheapside

107 Cheapside

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1605 kW
Installed machines:
3x FOCS-W 2602

Great Britain

Glasgow - Great Britain

141 Bothwell Street

141 Bothwell Street

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 2060 kW
Installed machines:
4x TECS-F 0502

Great Britain

London - Great Britain

16-19 Canada Square

16-19 Canada Square

Period: 2004
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1400 kW
Installed machines:
2x air cooled low noise chillers with screw compressors
Project managed by: POWERMASTER

Great Britain

London - Great Britain

198-202 Piccadilly

198-202 Piccadilly

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 653 kW
Installed machines:
1x FOCS-CA/SL 2722

Great Britain

London - Great Britain

2 Queen Anne's Gate Buildings

2 Queen Anne's Gate Buildings

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 284 kW
Heating capacity: 314 kW
Installed machines:
2x NECS-Q/SL 0604

Great Britain

London - Great Britain

200 Aldersgate Street

200 Aldersgate Street

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 5149 kW
Installed machines:
2x FOCS-CA/LN 5424, 2x FOCS-CA/SL 3602, 1x FOCS-CA/LN 4073

Great Britain

London - Great Britain

22 Chansery Lane

22 Chansery Lane

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 400 kW
Installed machines:
1x FOCS-CA/SL 1922

Great Britain

London - Great Britain

33 Lombard Street - Office Buildings

33 Lombard Street - Office Buildings

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 230 kW
Installed machines:
2x NECS/LN 0302
Project managed by: POWERMASTER

Great Britain

London - Great Britain

5 Broadgate

5 Broadgate

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 230 kW
Installed machines:
1x NECS-CN/B 1004

Great Britain

London - Great Britain

50 Bolsover Street

50 Bolsover Street

Period: 2012
Application:
Office Buildings; Residential buildings
Plant type: Hydronic System
Cooling capacity: 282,3 kW
Heating capacity: 240 kW
Installed machines:
1x NECS-WQ 1004

Great Britain

London - Great Britain

50 New Bond Street

50 New Bond Street

Period: 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 438 kW
Installed machines:
1x TECS-F/XL-E 0402

Great Britain

London - Great Britain

6-10 Withfield Street

6-10 Withfield Street

Period: 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 279 kW
Installed machines:
1x TECS-F/SL 0301

Great Britain

London - Great Britain

7 More London

7 More London

Period: 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 3440 kW
Installed machines:
2x FOCS-CA/SL 3152, 2x FOCS-CA-R/SL 3152

Great Britain

London - Great Britain

80 Cheapside

80 Cheapside

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1210 kW
Installed machines:
2x FOCS-CA/LN 2702

Great Britain

London - Great Britain

95 Gresham Street London - Office Buildings

95 Gresham Street London - Office Buildings

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1269 kW
Installed machines:
1x FOCS-CA/SL 5424
Project managed by: POWERMASTER

Great Britain

Manchester - Great Britain

A.L.U. Christie Hospital

A.L.U. Christie Hospital

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 100 kW
Installed machines:
1x NECS/LN 0412
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Abbey 2-3 Triton Square

Abbey 2-3 Triton Square

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 2874 kW
Installed machines:
3x TECS-F/SL 1004

Great Britain

Glasgow - Great Britain

Abbey Glasgow

Abbey Glasgow

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1040 kW
Installed machines:
1x TECS-F/SL 1004
Project managed by: POWERMASTER

Great Britain

Sheffield - Great Britain

Abbey Sheffield

Abbey Sheffield

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 846 kW
Installed machines:
1x TECS-F/SL 0904
Project managed by: POWERMASTER

Great Britain

Edinburgh - Great Britain

Aegon - South Gyle

Aegon - South Gyle

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 516 kW
Installed machines:
2x NECS-ST/SL 0904
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Africa House

Africa House

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1576 kW
Installed machines:
3x TECS2-CA/XL 0512, 1x NECS/SL 0412

Great Britain

London - Great Britain

Anchorage & Capstan House

Anchorage & Capstan House

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 5405 kW
Installed machines:
7x FOCS-CA/SL 2722, 1x FOCS-CA/SL 2022, 1x FOCS/SL 2652

Great Britain

Offices all over the country - Great Britain

Barclays

Barclays

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 10000 kW
Installed machines:
Air cooled large chillers with screw compressors
Project managed by: POWERMASTER

Great Britain

Yorkshire - Great Britain

Barn Conversion

Barn Conversion

Period: 2009
Application:
Residential buildings
Plant type: Dedicated heat pumps
Cooling capacity: 34 kW
Heating capacity: 24 kW
Installed machines:
1x BWR-HT Cube Z1T24 ground source heat pump

Great Britain

London - Great Britain

BBC Headquarters Portland Place

BBC Headquarters Portland Place

Period: 2003 - 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 12400 kW
Installed machines:
4x FOCS/SL-S 3002, 6x FOCS/SL 8404

Great Britain

Limehouse - London - Great Britain

Berglen Court

Berglen Court

Period: 2012
Application:
Residential buildings
Plant type: Hydronic System
Cooling capacity: 118 kW
Installed machines:
1 x NECS/LN T 0512

Great Britain

Nottingham - Great Britain

BRF - Nottingham University

BRF - Nottingham University

Period: 2011
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 47 kW
Installed machines:
1x NECS/B 0302

Great Britain

Bristol - Great Britain

Bristol & West Headquarters

Bristol & West Headquarters

Period: 2000
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 2400 kW
Installed machines:
6x air cooled chillers
Project managed by: POWERMASTER

Great Britain

Chelmsford - Great Britain

Broomfield Hospital Essex

Broomfield Hospital Essex

Period: 2008
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 1950 kW
Installed machines:
3x FOCS-CA/SL 2712
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Brunei Gallery

Brunei Gallery

Period: 2011
Application:
Museum; School / University
Plant type: Hydronic System
Cooling capacity: 455 kW
Installed machines:
1x TECS2/SL-CA E 0452

Great Britain

London - Great Britain

Central Saint Giles

Central Saint Giles

Period: 2009
Application:
Office Buildings; Shopping Centre
Plant type: Hydronic System
Cooling capacity: 1879 kW
Installed machines:
3x FOCS-W 7204

Great Britain

Essex - Great Britain

Chase High School Essex

Chase High School Essex

Period: 2010
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 138 kW
Installed machines:
1x NECS-Q/SL 0604

Great Britain

London - Great Britain

Chiswick Park Estate - Building 6

Chiswick Park Estate - Building 6

Period: 2012
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1965 kW
Installed machines:
3x FOCS-CA/LN 2702

Great Britain

Edinburgh - Great Britain

City Arts Centre

City Arts Centre

Period: 2009
Application:
Museum
Plant type: Hydronic System
Cooling capacity: 290 kW
Installed machines:
1x NECS-FC/SL NG 1104
Project managed by: POWERMASTER

Great Britain

Leeds - Great Britain

City Inn

City Inn

Period: 2008
Application:
Hotel and resorts
Plant type: Hydronic System
Cooling capacity: 780 kW
Installed machines:
2x FOCS/SL 3602
Project managed by: POWERMASTER

Great Britain

Manchester - Great Britain

City of Manchester Stadium

City of Manchester Stadium

Period: 2002
Application:
Sport structures
Plant type: Hydronic System
Cooling capacity: 1200 kW
Installed machines:
2x FOCS-W , 1x TECS
Project managed by: POWERMASTER

Great Britain

London - Great Britain

City University London

City University London

Period: 2008
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 541 kW
Installed machines:
1x TECS-F/SL 0500
Project managed by: POWERMASTER

Great Britain

Hatfield - Great Britain

Computacenter

Computacenter

Period: 2010
Application:
Data Center; Office Buildings
Plant type: Hydronic System
Cooling capacity: 956 kW
Installed machines:
2x FOCS-CA/SL-S 2022

Great Britain

London - Great Britain

Corinthia Hotel London

Corinthia Hotel London

Period: 2009
Application:
Hotel and resorts
Plant type: Hydronic System
Cooling capacity: 2136 kW
Installed machines:
4x TECS-F/SL 0502

Great Britain

North Wales - Great Britain

Costal Bulgalow

Costal Bulgalow

Period: 2009
Application:
Residential buildings
Plant type: Dedicated heat pumps
Cooling capacity: 6 kW
Heating capacity: 6 kW
Installed machines:
1x AWR MTD 0011

Great Britain

Reading - Great Britain

DediPower Reading Data Centre

DediPower Reading Data Centre

Period: 2010
Application:
Data Center
Plant type: Hydronic System
Cooling capacity: 1015 kW
Installed machines:
2x NECS/LN 1204, 1x NECS-FC/B 1204

Great Britain

Leven - Great Britain

Diageo

Diageo

Period: 2010
Application:
Food & Drink
Plant type: Hydronic System
Cooling capacity: 544 kW
Installed machines:
2x FOCS-W/B 2602

Great Britain

Dundee - Great Britain

Dundee University

Dundee University

Period: 2009
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 515 kW
Installed machines:
1x TECS-F/SL D 502
Project managed by: POWERMASTER

Great Britain

Reading - Great Britain

ECMWF

ECMWF

Period: 2008 - 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 4596 kW
Installed machines:
6x TECS-F/XL 0803

Great Britain

London - Great Britain

Galileo Connect London Central

Galileo Connect London Central

Period: 2012
Application:
Data Center
Plant type: HPAC System
Cooling capacity: 4852 kW
Installed machines:
3x TECS2/XL-CA/S 0853, 1x MANAGER 3000, 15x ACU HT 070, 14x ACU HT 030

Great Britain

Worchester, Midlands - Great Britain

Georgian Property

Georgian Property

Period: 2009
Application:
Residential buildings
Plant type: Dedicated heat pumps
Cooling capacity: 13 kW
Heating capacity: 13 kW
Installed machines:
1x high efficiency medium temperature dedicated heat pump, air cooled

Great Britain

Glasgow - Great Britain

Glasgow Science Centre

Glasgow Science Centre

Period: 2004
Application:
Museum
Plant type: Hydronic System
Cooling capacity: 1500 kW
Installed machines:
1x FOCS-CA, 1x FOCS-W/CA
Project managed by: POWERMASTER

Great Britain

Harlow - Great Britain

Glaxo Smith Kline

Glaxo Smith Kline

Period: 2009
Application:
Chemical & pharmaceutical ; Office Buildings
Plant type: Hydronic System
Cooling capacity: 1100 kW
Installed machines:
2x TECS-F/SL-S 0502

Great Britain

Petershill - Great Britain

Goldman Sachs

Goldman Sachs

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1560 kW
Installed machines:
2x FOCS-CA/LN-S 3602

Great Britain

London - Great Britain

Governor's House London

Governor's House London

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1911 kW
Installed machines:
3x FOCS/LN 3152

Great Britain

Guildford - Great Britain

Guildford Spectrum Leisure Complex

Guildford Spectrum Leisure Complex

Period: 2008
Application:
Sport structures
Plant type: Hydronic System
Cooling capacity: 282 kW
Installed machines:
1x ERACS-Q/B 1362

Great Britain

Great Britain - Great Britain

Guinness

Guinness

Period: 2004
Application:
Food & Drink
Plant type: Hydronic System
Cooling capacity: 320 kW
Installed machines:
1x high efficiency air cooled chiller
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Hainault Forest High School

Hainault Forest High School

Period: 2011
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 140 kW
Heating capacity: 95 kW
Installed machines:
1x NECS-WQ 0412

Great Britain

Cambridge - Great Britain

Hauser Forum Cambridge University

Hauser Forum Cambridge University

Period: 2009
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 688 kW
Installed machines:
2x NECS-ST/SL 1104, 1x NECS-ST/SL 704
Project managed by: POWERMASTER

Great Britain

Birmingham - Great Britain

Heartlands Hospital - Birmingham

Heartlands Hospital - Birmingham

Period: 2006
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 728 kW
Installed machines:
2x FOCS 1351

Great Britain

Blackpool - Great Britain

Highfield Humanities College

Highfield Humanities College

Period: 2012
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 228 kW
Installed machines:
1x NECS-W/B 0804

Great Britain

Salford - Great Britain

Hope Hospital

Hope Hospital

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 300 kW
Installed machines:
1x NECS/LN 1204
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Imperial College - Sherfield Building

Imperial College - Sherfield Building

Period: 2009
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 119 kW
Installed machines:
1x NECS/LN 0512

Great Britain

Norwich - Great Britain

John Innes B101 Server Room

John Innes B101 Server Room

Period: 2012
Application:
Data Center
Plant type: HPAC System
Cooling capacity: 80 kW
Installed machines:
2x AC 041 Close Control Units

Great Britain

London - Great Britain

King's College - East Wing Somerset House

King's College - East Wing Somerset House

Period: 2011
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 1506 kW
Installed machines:
1x FOCS-CA/LN 2712, 1x FOCS-CA/LN 3902

Great Britain

London - Great Britain

Kings Place

Kings Place

Period: 2005 - 2008
Application:
Theatres
Plant type: Hydronic System
Cooling capacity: 3500 kW
Installed machines:
3x TECS-W

Great Britain

Midlands - Great Britain

Large New Rural Property

Large New Rural Property

Period: 2010
Application:
Residential buildings
Plant type: Dedicated heat pumps
Cooling capacity: 24 kW
Heating capacity: 17 kW
Installed machines:
1x ground source heat pump

Great Britain

Cambridge - Great Britain

LMB Cambridge

LMB Cambridge

Period: 2010
Application:
Office Buildings; School / University
Plant type: Hydronic System
Cooling capacity: 1615 kW
Heating capacity: 2290 kW
Installed machines:
5x ERACS-WQ/B S 1902, controlled by group device MANAGER 3000
Project managed by: POWERMASTER

Great Britain

Glasgow - Great Britain

Loch Lomond Distillery

Loch Lomond Distillery

Period: 2009
Application:
Food & Drink
Plant type: Hydronic System
Cooling capacity: 600 kW
Installed machines:
1x FOCS-W 2402
Project managed by: POWERMASTER

Great Britain

Outlets all over the country - Great Britain

Marks & Spencer

Marks & Spencer

Period: 2002 - 2009
Application:
Store
Plant type: Hydronic System
Cooling capacity: 2500 kW
Installed machines:
Chillers with capacity from 30kW to 2500kW
Project managed by: POWERMASTER

Great Britain

Liverpool - Great Britain

Marks & Spencer Liverpool

Marks & Spencer Liverpool

Period: 2009
Application:
Store
Plant type: Hydronic System
Cooling capacity: 530 kW
Installed machines:
2x NECS-ST/HL 1004
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Marks & Spencer Marble Arch

Marks & Spencer Marble Arch

Period: 2011
Application:
Store
Plant type: Hydronic System
Cooling capacity: 625 kW
Installed machines:
2x FOCS-XL 3202

Great Britain

Norwich - Great Britain

Marks & Spencer Norwich

Marks & Spencer Norwich

Period: 2009
Application:
Store
Plant type: Hydronic System
Cooling capacity: 550 kW
Installed machines:
1x FOCS/LN 2652
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Marriott Lingfield Park London

Marriott Lingfield Park London

Period: 2009
Application:
Hotel and resorts
Plant type: Hydronic System
Cooling capacity: 1080 kW
Installed machines:
2x TECS-F/XL 0500
Project managed by: POWERMASTER

Great Britain

Aberdeen - Great Britain

McIntosh Donald

McIntosh Donald

Period: 2009
Application:
Food & Drink
Plant type: Hydronic System
Cooling capacity: 400 kW
Installed machines:
2x FOCS-ME 1002
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Montevetro Residential Developement

Montevetro Residential Developement

Period: 2000
Application:
Residential buildings
Plant type: Hydronic System
Cooling capacity: 1000 kW
Installed machines:
4x low noise water cooled chiller for indoor installation
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Moor House

Moor House

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 990 kW
Installed machines:
2x FOCS-CA/SL 2022

Great Britain

London - Great Britain

Mulberry Store

Mulberry Store

Period: 2011
Application:
Store
Plant type: Hydronic System
Cooling capacity: 93,9 kW
Installed machines:
1x NECS-N/LN 0412

Great Britain

Uxbridge - Great Britain

New Bakers Court

New Bakers Court

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1800 kW
Installed machines:
2x FOCS-CA/LN-S 3602

Great Britain

London - Great Britain

Paddington Central - Phase 2

Paddington Central - Phase 2

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 2900 kW
Installed machines:
2x FOCS/SL 6314

Great Britain

Twickenham - London - Great Britain

Premier House

Premier House

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 556 kW
Installed machines:
1x FOCS-FC-NG/SL 1502, 1x NECS-ST/SL 1004

Great Britain

Basingstoke - Great Britain

Primark Store - Basingstoke

Primark Store - Basingstoke

Period: 2007
Application:
Store
Plant type: Hydronic System
Cooling capacity: 500 kW
Installed machines:
2x NECS/B 1004

Great Britain

High Wycombe - Great Britain

Primark Store - High Wycombe

Primark Store - High Wycombe

Period: 2008
Application:
Store
Plant type: Hydronic System
Cooling capacity: 515 kW
Installed machines:
1x FOCS/B 2642

Great Britain

Lewisham - Great Britain

Primark Store - Lewisham

Primark Store - Lewisham

Period: 2010
Application:
Store
Plant type: Hydronic System
Cooling capacity: 207,2 kW
Installed machines:
2x NECS-N/B 0452

Great Britain

Woking - Great Britain

Primark Store - Woking

Primark Store - Woking

Period: 2010
Application:
Store
Plant type: Hydronic System
Cooling capacity: 151,3 kW
Installed machines:
1x NECS-N/B 0252, 1x NECS-N/LN 0412

Great Britain

Telford - Great Britain

Primark Telford

Primark Telford

Period: 2009
Application:
Store
Plant type: Hydronic System
Cooling capacity: 492 kW
Installed machines:
2x air cooled high efficiency chiller
Project managed by: POWERMASTER

Great Britain

Birmingham - Great Britain

Primary Care

Primary Care

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 235 kW
Installed machines:
1x NECS/HL 0704, 1x NECS/SL 0152
Project managed by: POWERMASTER

Great Britain

Southampton - Great Britain

Princess Anne Hospital Southampton

Princess Anne Hospital Southampton

Period: 2008
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 590 kW
Installed machines:
2x water cooled chiller with centrifugal compressors
Project managed by: POWERMASTER

Great Britain

Chelmsford - Great Britain

Priory Place Chelmsford

Priory Place Chelmsford

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 506 kW
Installed machines:
1x TECS-A 2AN

Great Britain

Chiswick - Great Britain

QVC Chiswick

QVC Chiswick

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 3738 kW
Installed machines:
2x FOCS-CA/SL 5424 Duplex, 2x NECS-Q/SL 2418

Great Britain

Liverpool - Great Britain

Rathbone Hospital

Rathbone Hospital

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 55 kW
Installed machines:
1 air cooled unit with scroll compressors
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Regent's Place

Regent's Place

Period: 2008
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 4224 kW
Installed machines:
4x TECS-F/XL 0502, 4x TECS-F/XL 0803

Great Britain

Wigan - Great Britain

Royal Albert & Edward Infirmary

Royal Albert & Edward Infirmary

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 530 kW
Installed machines:
2x TECS 2AS/LN
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Savannah House

Savannah House

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 656 kW
Installed machines:
1x FOCS-CA/LN 2722

Great Britain

London - Great Britain

Sheraton Hotel Heathrow

Sheraton Hotel Heathrow

Period: 2006
Application:
Hotel and resorts
Plant type: Hydronic System
Cooling capacity: 334,4 kW
Installed machines:
1x FOCS/LN 1942

Great Britain

Glasgow - Great Britain

Stobhill Hospital

Stobhill Hospital

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 2268 kW
Installed machines:
2x FOCS/SL 4822
Project managed by: POWERMASTER

Great Britain

Ashton under Lyne - Great Britain

Tameside Hospital

Tameside Hospital

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 200 kW
Installed machines:
2x NECS/B 0412
Project managed by: POWERMASTER

Great Britain

Glasgow - Great Britain

Tay House

Tay House

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1772 kW
Installed machines:
2x FOCS-CA/SL3902
Project managed by: POWERMASTER

Great Britain

Reading - Great Britain

Thames Valley Park - Building 300

Thames Valley Park - Building 300

Period: 2011
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 758 kW
Installed machines:
2x NECS/SL 1414

Great Britain

Exeter - Great Britain

The Forum - University of Exeter

The Forum - University of Exeter

Period: 2003 - 2011
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 297,5 kW
Heating capacity: 59,4 kW
Installed machines:
1x TECS, 1x NECS-WQ 0302
Project managed by: POWERMASTER

Great Britain

London - Great Britain

The Willis Building

The Willis Building

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 6000 kW
Installed machines:
7x TECS
Project managed by: POWERMASTER

ENDEFRESproject sheet
Great Britain

Croydon - Great Britain

Trafalgar House

Trafalgar House

Period: 2006
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 442 kW
Installed machines:
1x FOCS/LN 1962

Great Britain

London - Great Britain

Twickenham Stadium

Twickenham Stadium

Period: 2006 - 2009
Application:
Sport structures
Plant type: Hydronic System
Cooling capacity: 3500 kW
Installed machines:
7x TECS 2AS
Project managed by: POWERMASTER

Great Britain

Newcastle - Great Britain

Tyneview Park Newcastle

Tyneview Park Newcastle

Period: 2009
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 2925 kW
Installed machines:
3 x FOCS LN 4212
Project managed by: POWERMASTER

Great Britain

London - Great Britain

UCL - Biological Services Unit

UCL - Biological Services Unit

Period: 2009
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 530 kW
Installed machines:
2x TECS-F/SL 0301

Great Britain

Leaderhead - Great Britain

Unilever UK - Leaderhead

Unilever UK - Leaderhead

Period: 2007
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1056 kW
Installed machines:
2x FOCS-CA/LN 2602

Great Britain

London - Great Britain

University of the Arts London

University of the Arts London

Period: 2009
Application:
School / University
Plant type: Hydronic System
Cooling capacity: 2493 kW
Installed machines:
3x FOCS-W 3202

Great Britain

Glasgow - Great Britain

Victoria Hospital

Victoria Hospital

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 5201 kW
Installed machines:
2x FOCS/SL 6903, 3x FOCS/XL 3602
Project managed by: POWERMASTER

Great Britain

Banbury - Great Britain

Vodafone Store - Banbury

Vodafone Store - Banbury

Period: 2009
Application:
Store
Plant type: Hydronic System
Cooling capacity: 449 kW
Installed machines:
1x TECS-F/XL E 402
Project managed by: POWERMASTER

Great Britain

Stornoway - Great Britain

Western Isle Hospital

Western Isle Hospital

Period: 2008
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 50 kW
Installed machines:
1x NECS/B 0182
Project managed by: POWERMASTER

Great Britain

London - Great Britain

Westferry Circus

Westferry Circus

Period: 2002
Application:
Office Buildings
Plant type: Hydronic System
Cooling capacity: 1300 kW
Installed machines:
3x air cooled low noise Climaveneta chillers
Project managed by: POWERMASTER

Great Britain

Wythenshawe - Great Britain

Wythenshawe Cardiac Centre

Wythenshawe Cardiac Centre

Period: 2007
Application:
Healthcare / Hospitals
Plant type: Hydronic System
Cooling capacity: 550 kW
Installed machines:
1x TECS 2AS/LN
Project managed by: POWERMASTER